How SR&ED Tax Credits Factor Into a Manufacturing Feasibility Study

How to count SR&ED credits in a manufacturing feasibility study: which work qualifies, where commercial production begins, what the credits are worth, and how to model the risk and timing.

Quick Summary: SR&ED tax credits can reduce the net cost of the technical development work in a manufacturing project, but only for experimental work, not commercial production. This guide explains the 2026 federal rules, eligible work and costs, the Saskatchewan credit, CRA pre-claim approval, and how to model credits conservatively with a hypothetical example. Figures are illustrative or attributed.

1. Why SR&ED Belongs in a Manufacturing Feasibility Study

A manufacturing feasibility study asks whether a plant, line or process can be built and run profitably. For many new products and processes, the hardest question is technical: will the process hit the required tolerance, yield or throughput at scale? Answering it often means experiments, trial runs and engineering time before any commercial production begins.

That is the work Canada's SR&ED program is designed to support. Counted correctly, SR&ED credits reduce the net cost of the technical development phase and can improve the risk profile of the project. Counted carelessly, they become an optimistic line in a spreadsheet that the Canada Revenue Agency (CRA) later disallows.

This guide explains how to treat SR&ED in a feasibility study: the 2026 federal rules, which manufacturing work can qualify, where commercial production begins, which costs count, how the Saskatchewan credit fits, and how to model the timing and the uncertainty. It pairs with our guide to manufacturing plant feasibility studies, and every dollar figure in the example is hypothetical.

Want SR&ED Built Into Your Feasibility Model?

Talk to a Custom CPA advisor about how to estimate credits, timing and risk before you commit capital.

2. SR&ED at a Glance: The 2026 Federal Rules

FeatureFederal rule (per the CRA)
Basic ITC rate15% of qualified SR&ED expenditures
Enhanced rate35% for most CCPCs, up to the expenditure limit; eligible Canadian public corporations can also earn it for tax years beginning after December 15, 2024
Annual expenditure limit (CCPC)$3 million for tax years beginning before December 16, 2024; $6 million for tax years beginning after December 15, 2024
Taxable capital phase-out (CCPC)The limit starts to fall at $15 million and reaches nil at $75 million for tax years beginning after December 15, 2024 (previously $10 million to $50 million)
RefundabilityCurrent expenditures within the limit at 35%: 100% refundable; the credit earned on capital expenditures is 40% refundable; qualifying corporations earning 15% can have 40% refunded
Capital expendituresEligible again for property that became available for use after December 15, 2024
Carryover of unused creditsCarry back up to 3 years; carry forward up to 20 years
Claim deadline18 months after the tax year-end for corporations
  • Legislation: the CRA states that the enhancements received Royal Assent on March 26, 2026 (Bill C-15).
  • Check which year you are in: a corporation with a tax year starting before December 16, 2024 is under the old limit.
  • Associated corporations share the limit: the limit can be reduced and must be allocated among associated CCPCs, so group structure matters.

3. Which Manufacturing Work Can Qualify

The CRA says work is eligible when it meets the SR&ED definition in the Income Tax Act: a systematic investigation by experiment or analysis, carried out to resolve a scientific or technological uncertainty and to generate knowledge that advances the understanding of science or technology. Work must be conducted in Canada. R&D in the everyday sense is not necessarily SR&ED.

Manufacturing activityLikely treatmentWhy
Experiments to hit a tolerance or yield that known methods cannot achieveMay qualifyA technological uncertainty that routine engineering cannot remove
Pilot or scale-up trials that resolve process uncertaintyMay qualifyThe CRA gives scale-up and optimization of a process as an example of experimental development
Testing materials, geometry, tooling or control interactions systematicallyMay qualifyHypothesis, test and analysis, with records
Applying a standard, known solution or a workaround using available knowledgeDoes not qualifyThe CRA says a workaround using available knowledge does not meet the test
Normal installation, operator training, standard commissioningDoes not qualifyRoutine work, per practitioner guidance
Quality control or routine testingExcludedParagraph (f) of the definition
Market research or sales promotionExcludedParagraph (e); see our post on consumer behaviour research in the Canadian market
Style changes and routine data collectionExcludedParagraphs (j) and (k)
  • Uncertainty is the starting point: the CRA says work that circumvents the uncertainty with a workaround using available knowledge is not eligible.
  • The "how" matters too: the CRA says it is not enough that work be systematic; it expects a hypothesis, testing, and logical conclusions from the results.
  • Success is irrelevant: the CRA says success or failure in meeting objectives is not relevant to eligibility, so a failed trial can still be SR&ED.
  • Cost targets alone are not uncertainty, but the CRA notes that trying to meet them might create it.

4. The Boundary With Commercial Production

The most important line in a manufacturing context is between experimental work and commercial production. The CRA excludes the commercial production of a new or improved material, device or product and the commercial use of a new or improved process. A feasibility study should therefore separate the technical development phase from the production phase, in both the plan and the budget.

Typical Project Phases and SR&ED Relevance (Illustrative Framework)

Market and financial feasibility
Not SR&ED
Technical uncertainty experiments
Core SR&ED
Pilot-scale process trials
Possibly SR&ED
Installation and commissioning
Mostly routine
Commercial production
Excluded

Illustrative only: bar length shows how much of each phase is typically SR&ED-relevant, as a judgment framework and not a measured statistic. Actual eligibility depends on the facts of each project.

  • Test production runs: the CRA's older eligibility policy treats only the testing and data collection needed for the SR&ED work as eligible within a production run; producing more units than the experiment needs is a commercial activity.
  • Company project versus SR&ED project: the same policy says a company project has a commercial purpose, whereas an SR&ED project is for the advancement of scientific knowledge or technological advancement.
  • Mixed projects: split experimental time, people, materials and dates from routine production or commercial activity, so the claim follows a defensible boundary.

5. Which Costs Count

Cost typeHow it counts (per the CRA)
Salary or wagesEligible for people directly engaged in the SR&ED, for the time spent on it
Materials consumed or transformedEligible; consumed materials are those destroyed or made valueless by the work, including those absorbed, used up or broken down
Contracts for SR&ED and third-party payments80% of the amount qualifies for the ITC
Overhead and other expendituresClaimed under the traditional method only; the proxy method replaces them with a notional amount
Prescribed proxy amount (PPA)55% of salaries or wages for employees directly engaged in the SR&ED
Equipment lease costsEligible only if incurred after December 15, 2024
Capital expendituresEligible for property that became available for use after December 15, 2024
  • Payroll is the biggest driver: accurate time records for engineers, technicians and operators on experimental work are essential. Our post on payroll processing companies may help you set up records that support this.
  • Proxy or traditional: the choice changes the overhead claimed, so model both if overhead is significant.
  • Current expenditures are claimed in the year incurred.

6. The Saskatchewan R&D Tax Credit

Saskatchewan has its own Research and Development Tax Credit for qualifying R&D expenditures incurred by corporations in Saskatchewan. According to the province, Saskatchewan CCPCs receive a 10% refundable credit on qualifying expenditures up to an annual limit, which rose from the first $1 million to the first $2 million for expenditures on or after December 16, 2024. A 10% non-refundable credit applies above the limit and to other corporations, and total credits a corporation can claim are capped at $1 million a year. The credit is claimed on Schedule 403 with the Saskatchewan corporate income tax return.

  • Budget changes: the province's 2026-27 budget includes enhancements aligned with the federal changes, so check the latest limits and effective dates before you rely on the figures here.
  • Follows federal rules: practitioners report that the Saskatchewan credit uses the federal rules for eligible expenses and activities, and that it is treated as government assistance that reduces the federal qualified pool.
  • Location matters: the credit is for R&D carried out in Saskatchewan, so where the experimental work happens affects the provincial credit.
  • Representation: if the CRA reviews the claim, see our post on tax experts who represent you with the CRA in Saskatchewan, and our post on how to hire a tax expert for your Saskatchewan business.

7. Hypothetical Worked Example

Consider a hypothetical Saskatchewan CCPC developing a new composite panel process. All amounts are illustrative. The experimental work happens in Saskatchewan, the corporation is under the taxable capital phase-out threshold, and we assume the proxy method, with the Saskatchewan credit calculated on the same qualified base.

ComponentHypothetical amountQualified for the ITC
Salaries of engineers and technicians on experimental work$420,000$420,000
Materials consumed or transformed in trials$85,000$85,000
Arm's-length testing contract$100,000$80,000 (80%)
Prescribed proxy amount (55% × $420,000)Notional$231,000
Qualified expenditures$816,000

Hypothetical Qualified Expenditure by Component ($ thousands)

Salaries
$420K
Proxy overhead (PPA)
$231K
Materials
$85K
Contract (80%)
$80K

Hypothetical. Widths are scaled to the largest component (salaries, $420,000). The proxy amount is a notional figure, not cash spent.

Credits: the Saskatchewan credit at 10% is $81,600. If it reduces the federal qualified pool as practitioners describe, the federal base becomes $734,400, and the 35% federal credit is $257,040. Together that is $338,640, or 41.5% of the qualified expenditures. Without the pool reduction the credits would look like 45%, so the interaction is worth a few points.

Share of the work that qualifiesQualified expendituresTotal credits (41.5%)
100% (best case)$816,000$338,640
60% (base case)$489,600$203,184
30% (cautious case)$244,800$101,592

Hypothetical Total Credits by Share of Work That Qualifies ($ thousands)

100% qualifies
$339K
60% qualifies
$203K
30% qualifies
$102K

Hypothetical. Credits scale in proportion to the qualifying share in this simplified example. Widths are scaled to the best case ($338,640).

  • Do not divide the credit by cash spent: the proxy amount is notional, so the ratio to direct cash outlay would be misleading.
  • Capital illustration: if $200,000 of qualifying equipment became available for use after December 15, 2024, a 35% credit would be $70,000, of which 40% ($28,000) would be refundable and the rest would be a non-refundable credit that can be carried back or forward. Whether equipment qualifies is a technical question.
  • What the example omits: the income tax deduction side, taxable capital, associated corporations and ineligible spending.

Need Help Estimating What Your Project Could Claim?

Custom CPA can help you build a conservative SR&ED assumption into your projections and funding plan.

8. How to Model SR&ED in the Feasibility Cash Flow

Modelling choiceRecommendation
Base case versus upsidePut SR&ED in a separate line and run the base case with a conservative qualifying share; treat the full amount as upside
TimingCredits arrive after the year-end and the claim, not when the spending occurs; the claim deadline is 18 months after year-end, and the CRA reports that refundable claims selected for review are generally completed within 180 calendar days
Funding gapFund the full development spend up front; consider bridge financing against the expected refund
ScenariosModel 100%, 60% and 30% qualifying shares, as in the example
Group structureCheck associated corporations, which share one expenditure limit
Break-evenShow the break-even with and without credits so lenders can see the project does not depend on them

Our business planning and financial modeling service builds these scenarios into the projections, and our guide to sizing TAM, SAM and SOM shows how to test the demand side of the same study. The strategic CFO advisory services team can help with funding and cash-flow planning around the refund.

9. Pre-Claim Approval and Documentation

As of April 1, 2026, eligible small and medium businesses can use the CRA's optional pre-claim approval process to find out whether planned projects qualify before they start work or incur costs.

FeatureWhat the CRA says
PurposeTechnical approval of planned SR&ED projects before work starts or costs are incurred
ScopeUp to 3 projects per application
ValidityIf granted, valid for up to 3 years
ExpendituresNot assessed during pre-claim approval
Review speedClaims containing only pre-approved projects may get an accelerated 90-day expenditure-only review
DisagreementNo formal objection process; you can resubmit with material changes or claim after the work
OptionalYou can still submit a regular claim without it
  • Keep evidence as the work progresses: the CRA tells claimants to keep the information they generate during the work to support the claim.
  • Useful records: hypotheses, test plans and results, design changes, lab or trial notes, time records and invoices.
  • Why it suits manufacturers: large projects with significant capital investment are the kind of work where early certainty may matter, according to practitioner commentary.

10. Interactions With Grants, Capital and Tax

  • Other government funding: the CRA says receiving other government R&D funding may not make work ineligible, but assistance and contract payments can reduce qualified expenditures, so record every grant and loan forgiveness.
  • Provincial credits: the Saskatchewan credit is reported to reduce the federal pool, as shown in the example.
  • Capital: the return of capital eligibility after December 15, 2024 can improve the economics of pilot equipment, but only for property that qualifies and became available for use after that date.
  • Income tax: SR&ED also affects the deductible expenditure pool and may change taxable income, so tax planning and the credit calculation should be done together. Our core accounting and tax services cover this.
  • Financial statements: if lenders want assurance on the numbers, our post on compilation engagements versus review engagements explains the options, and our specialized services cover complex situations.

11. Risk Management: Financial Risk and Business Risk

Financial risk is the chance that credits are smaller, later or reversed compared with the model; business risk is the chance that the project depends on credits it cannot secure. Risk management means treating SR&ED as supportive, not as a pillar of the business case.

RiskTypeResponse
Work is judged routine, not SR&EDFinancial riskDocument the uncertainty; consider pre-claim approval; model a low qualifying share
Commercial production mixed with experimentsFinancial riskSeparate experimental activity, people and costs from production
Refund arrives lateFinancial riskFund the spend up front; arrange bridge financing if needed
Thin or missing recordsBusiness riskKeep evidence as the work progresses
Rules or limits changeBusiness riskCheck current CRA and provincial guidance before each claim
Project depends on the credits to break evenBusiness riskShow break-even without credits

12. Common Mistakes

MistakeWhy it mattersBetter approach
Treating the whole plant budget as SR&EDCommercial production is excludedClaim only the experimental work
Counting market or financial studiesMarket research is excludedSeparate technical work from market work
Using the full credit in the base caseOverstates cash flowUse a conservative qualifying share
Ignoring timingFunding gapModel the lag between spend and refund
Applying the old $3 million limit or ignoring the tax yearWrong credit estimateCheck which tax year applies
Forgetting the provincial interactionOverstates combined creditsModel the Saskatchewan credit and pool reduction
Not keeping contemporaneous recordsWeak support in a reviewDocument hypotheses and results as you go

13. The Master Checklist

  • List the technological uncertainties the project must resolve.
  • Separate experimental work from commercial production in the plan and budget.
  • Confirm the corporation's tax year, CCPC status, taxable capital and associated companies.
  • Estimate qualified salaries, materials, contracts and overhead, using proxy or traditional method.
  • Apply the 80% rule to contracts and third-party payments.
  • Model the Saskatchewan credit and its effect on the federal pool.
  • Run 100%, 60% and 30% qualifying-share scenarios.
  • Show the funding gap and break-even without credits.
  • Consider pre-claim approval before work starts.
  • Set up time records, test logs and document control from day one.

14. Frequently Asked Questions

What is the SR&ED tax credit and how much can a manufacturer get back?

SR&ED is Canada's federal tax incentive for eligible research and development work. The basic investment tax credit is 15% of qualified expenditures. Most Canadian-controlled private corporations (CCPCs) can earn an enhanced, refundable 35% credit up to an annual expenditure limit, which is $6 million for tax years beginning after December 15, 2024. What a manufacturer actually receives depends on how much of its work and spending qualifies.

Is building a new manufacturing plant eligible for SR&ED?

The plant and its commercial production are not. The CRA excludes the commercial production of a new or improved product and the commercial use of a new or improved process. Experimental work that resolves a genuine technological uncertainty, such as process development or pilot-scale trials, can qualify, and capital expenditures made after December 15, 2024 can now be eligible. Where the line falls depends on your specific facts, so get advice before you rely on it.

Can a feasibility study itself qualify for SR&ED?

Only the technical experimental parts can. Market research and sales promotion are excluded from SR&ED, and so are quality control and routine testing. A market, financial or economic feasibility analysis is therefore not SR&ED, but experiments to resolve a technological uncertainty in a process or product may be, if they meet the CRA's tests.

How long does it take to receive an SR&ED refund?

A corporation has 18 months after its tax year-end to file an SR&ED claim. The CRA says refundable claims selected for review are generally completed within 180 calendar days of receiving a complete claim. For claims that contain only projects with pre-claim approval, the CRA may carry out an accelerated 90-day expenditure-only review. Plan your cash flow on the assumption that the refund arrives well after the spending.

Does Saskatchewan have its own R&D tax credit?

Yes. The Saskatchewan Research and Development Tax Credit is available for qualifying R&D expenditures incurred by corporations in Saskatchewan. It offers a 10% refundable credit to Saskatchewan CCPCs up to an annual qualifying expenditure limit, and a 10% non-refundable credit above that limit. It is claimed on Schedule 403 with the Saskatchewan corporate return. Confirm the current limits, as the province announced enhancements in its 2026-27 budget.

15. Final Thoughts

SR&ED can meaningfully reduce the cost of developing a new manufacturing process, but only for the experimental work, and only if the records support it. In a feasibility study, estimate the credits conservatively, separate them from commercial production, model the lag before the refund, and show that the project stands without them. Then use pre-claim approval and good documentation to turn an estimate into a defensible claim.

Ready to Plan Your Manufacturing Project With SR&ED in Mind?

Book a conversation with Custom CPA about credits, projections and funding for your feasibility study.

Disclaimer: The above contents are provided for general guidance only, based on information believed to be accurate and complete, but we cannot guarantee its accuracy or completeness. It does not provide legal advice, nor can it or should it be relied upon. Please contact/consult a qualified tax professional specific to your case.